Shenzhen, China

University General Hospital — Dental Centre

Time span

11 months

Size

8,266 m²

Client

Shenzhen Public Works Bureau

Status

Completed and in use

Location

Shenzhen, China

Type

Specialized dental hospital

Our vision for the Shenzhen University Oral Centre redefines medical space transformation through speed, precision, and functional design. Covering 8,266 square metres to accommodate 80 dental chairs, the project breathes new life into high-capacity clinical infrastructure.

At the core of the execution is a seamless interior integration—from high-tech wall systems and specialized flooring to custom medical cabinetry. Leveraging a full dry-assembly method, the interior buildout took just 11 months, accelerating delivery by 60%.

More than a renovation, this project serves as a national benchmark, establishing a scalable framework for converting commercial real estate into modern healthcare facilities.

A healthcare interior is more than walls and cabinetry; it is an environment of trust. We designed a space where high-performance materials and clean lines seamlessly serve clinical precision and patient comfort

Engineering Harmony & Quality Standards

On-site, our team focused on strict compliance with sanitary codes and interior space optimization. We executed a complex fit-out, integrating easy-to-clean antibacterial wall solutions, high-traffic specialized flooring, and modular clinical furniture. Utilizing prefabricated elements and dry-process methods allowed for simultaneous installation across multiple zones, eliminating dust hazards and ensuring seamless alignment of all interior components

THIS PROJECT PROVES THAT MODERN HEALTHCARE BEGINS WITH SPACE. BY COMBINING INNOVATIVE MATERIALS, ADVANCED ENGINEERING, AND THOUGHTFUL DESIGN, WE CREATED A BRIGHT, SAFE, AND COMFORTING ENVIRONMENT WHERE TECHNOLOGY SEAMLESSLY SERVES HUMAN CARE.

Project Details